![]() FIG 1: 48 inch caisson supported by Michigan front-end loader |
![]() FIG 2: Caisson after jetting down to bedrock |
![]() FIG 3: Close-up of caisson cutting head with carbide teeth just visible. Note airholes about one foot above water jet holes |
![]() FIG 4: Detail of hose connection assembly on caisson. Note hydraulic piston to left of man. |
![]() FIG 5: Mr. Stephansen enters caisson to inspect bedrock exposed at base. |
![]() FIG 6: Mr. Stephansen at base of caisson as remaining water is pumped out. |
![]() FIG 7: Examination of gravel and cobbles (and boulders) removed from caisson |
![]() FIG 8: Portable gravel-processing plant BLO fecit 20031109 in memory of our good friend Erik Stephansen who died in 2002 |